3635*2 KVA Oil Immersed Rectifier Transformer

220KV series oil immersed power transformer produced with global advanced technology and equipment, continuously updating the manufacturing experience and processing. We developed high-grade power transformer that sufficiently satisfy the operation conditions of domestic and foreign power grid.

Send Inquiry

PRODUCT DETAILS

The rated power of the transformer is 2 x (3635 – 2562/2562) kVA with OFAF cooling, the primary voltage is 22 kV with 462,433,390,346,303,260V tapping range(NLTC), the secondary voltage is 2 of 462 V, they formed a vector group of Yy0y6 & Dy5y11.

 

Our 2 x (3635 – 2562/2562) kVA rectifier transformer was designed with advanced technology and adopts high quality material and components which result in reliable quality and long operation time.


Scope of Supply

Product: Oil Immersed Rectifier Transformer

Rated Power: Up to 100 MVA

Primary Voltage: Up to 110 KV

The transformer can be designed according to customer’s requirements

 

Technical Data Sheet

3635*2 kVA oil immersed rectifier transformer specifications and data sheet


ModelZHSFPK-3635*2 kVA-22/2*0.462KV
TypeOil Immersed Rectifier Transformer
StandardIEC60076
Rated Power3635*2 kVA
Frequency50 HZ
Phase3/12
Cooling TypeOFAF
Primary Voltage22 KV
Secondary Voltage2*462V
Winding MaterialCopper
Vector GroupYy0y6&Dy5y11
Impedance6.5 ± 10%
Tap ChangerNLTC
Tapping Range462,433,390,346,303,260 V
No Load Loss6200*2W
On Load Loss44500*2W


20230112141658195ef722f83b4a118790851756d4d720.jpg

2023011214180774a94592888a443e853c9be23af5ef76.jpg

202301121417184b11d98736ca41888852cc69c5360fa5.jpg

202301121420184c37ad99a9d04326a7bd78f98bef427a.jpg


2023011214195612be29adecb14292bb8893e77332d8fd.jpg


20230112141839aacc6942a74b45b99d9f17320afe181c.jpg


20230112141742d13a8d8462de49ddb2fbbc1ea731c5da.jpg


20230112142326c25471f09b7e406dac9077dbccfbb406.jpg

Packing attention

Special attention shall be paid to the loading of the transformer when loading: due to the concentrated weight of the transformer, the concentrated load at the bottom of the ship shall be guaranteed when considering the barge to be carried, and reinforcement measures shall be taken if necessary; the bumping wave of the ship shall be taken into consideration in water transportation, and the binding must be firm.

RELEVANT RECOMMENDATION

ONLINE CONSULTATION

Submit